HOME 

The weather has turned great, so I'm going to start painting. First I need to install the gas tank between the frame rails.

This picture shows my engine hoist picking up the back.

I've got to try something different here when I'm lifting. The body can rock over very easy.
Think I'll try using to points to lift from instead of one.

This is as high as I can lift it. I have 8 foot ceilings.

Up against the roof. Next project is a bigger shop with taller ceilings.

One thing I do like is I can roll the frame out anytime.

Well as you can see the interior is painted. got to clear coat it.

Just another shot.

There is a lot of room under here.

Stay tune.

Back to the First Page
Next Page of the Build